Below is a timeline of some of our greatest directional drilling & thrust boring achievements. As a leader in directional drilling (HDD), we pride ourselves in having the ability to plan and execute your directional drilling initiative. With multiple drilling rigs and crews, Salwan is fully capable of handling all of your complex project requirements, simultaneously and independently.

 
Salwan Projects List 01

Project Details Last 5 Years

We work on a wide range of building typologies and projects
Sl#PROJECTCLIENTDESCRIPTIONLOCATION
1CAST HOUSE- STOCK YARDEMALINSTALLATION OF 110MM HDPE BY DIRECTIONAL BORINGABU DHABI
2KPIZADPCINSTALLATION OF 110/160MM HDPE BY DIRECTIONAL BORINGTAWEELA
3QFDADCOINSTALLATION OF 14" GAS LINE BY DIRECTIONAL BORINGQUSAHWIRA
4N - 6755ADWEAINSTALLATION OF 3X225+2X125MM HDPE BY DIRECTIONAL BORINGAL FALAH
5D - 11617D O TINSTALLATION OF 200MM HDPE BY DIRECTIONAL BORINGAL KHATIM
60300407GASCOINSTALLATION OF 160MM HDPE BY DIRECTIONAL BORINGBUHASA
7C002 PACKAGE IIBUNYAINSTALLATION OF 200/110MM HDPE BY DIRECTIONAL BORINGREEM ISLAND
8D - 101448ADDCINSTALLATION OF 200MM HDPE BY DIRECTIONAL BORINGADNEC AREA
9KHAZNA DATA CENTERMUBADALAINSTALLATION OF 200/110MM HDPE BY DIRECTIONAL BORINGAL RAHA
10D9219ADDCINSTALLATION OF 200/110MM HDPE BY DIRECTIONAL BORINGPRESIDENTIAL PALACE RAS AL AKHDAR AREA
11D8250 V02ADDCINSTALLATION OF 450MM HDPE BY DIRECTIONAL BORINGPRESIDENTIAL PALACE RAS AL AKHDAR AREA
12N-12380TRANSCOINSTALLATION OF 280/125MM HDPE BY DIRECTIONAL BORINGMADINAT ZAYED – LIWA
13C002 PACKAGE IIBUNYAINSTALLATION OF 200/110 MM HDPE BY DIRECTIONAL BORINGREEM ISLAND
14GASCO-5273GASCOINSTALLATION OF 150MM CS BY DIRECTIONAL BORINGHABSHAN
15P1050ADCOINSTALLATION OF 150 MM CS BY DIRECTIONAL BORINGHABSHAN
16D-12083ADDCINSTALLATION OF 200/110MM HDPE BY DIRECTIONAL BORINGAL WATHBA CAMEL RACE
17CMW-10004-C007COMMAND OF MILITARYINSTALLATION OF 550 MM HDPE BY (UNDER CHANNEL) DIRECTIONAL BORINGGHANTOOT
18CONTRACT ADCOINSTALLATION OF 110 MM HDPE BY DIRECTIONAL BORINGBUHASA
19N- 6977/ BTRANSCOINSTALLATION OF 250/110MM HDPE BY DIRECTIONAL BORINGAL AIN- ALFAYIDA
20D-101725ADM- WES. REGIONINSTALLATION OF 200MM HDPE BY DIRECTIONAL BORINGRUWAIS
21D-102242 (KASHONA)ADDCINSTALLATION OF 500MM HDPE BY DIRECTIONAL BORINGAJBAN-KASHONA PIPELINE
22MBZ PHASE 2- CONTRACT 2ADMINSTALLATION OF 200MM HDPE BY DIRECTIONAL BORINGMBZ – ABU DHABI
23D-11081ADDCINSTALLATION OF 200/110MM HDPE BY DIRECTIONAL BORINGE 25/14- ABU DHABI
24A -12561AADCINSTALLATION OF 200/110MM HDPE BY DIRECTIONAL/THRUST BORINGAL AIN
25D-8252 V-03ADDCINSTALLATION OF 630 MM HDPE BY DIRECTIONAL BORINGRAS AL AKHDAR ABU DHABI
26D-11092ADDCINSTALLATION OF 225/110MM HDPE BY DIRECTIONAL BORING UNDER SEAUMM AL NAAR – ABU DHABI
27P14-003GASCOINSTALLATION OF 24"/6" STEEL/ HDPE BY DIRECTIONAL BORINGSAADIYAT ISLAND ABU DHABI
28CONTRACT-15535.01ADCOINSTALLATION OF 4"/6"/8" STEEL BY DIRECTIONAL BORINGBUHASA
29CONTRACT-15267.01ADCOINSTALLATION OF 4"/6"/8" STEEL BY DIRECTIONAL BORINGHABSHAN
30CONTRACT-Bb 1042GASCOINSTALLATION OF 4"/6"/8" GAS LINE BY DIRECTIONAL BORINGHABSHAN/ASAB
31AL AIN HOSPITALSEHAINSTALLATION OF 200/110 MM HDPE BY DIRECTIONAL BORINGAL AIN
32LUSAIL DEVELOPMENTLUSAIL REAL ESTATE DEV. CO.INSTALLATION OF 160 MM HDPE BY DIRECTIONAL BORINGQATAR
33CONSTRUCTION INTERNEL ROADSMUSANADAINSTALLATION OF 315MM/500MM HDPE BY DIRECTIONAL BORINGABUDHABI
3433KV CABLE LAYINGGASCOINSTALLATION OF 225MM/125MM HDPE BY DIRECTIONAL BORINGINSTAWEELAH
35TAWEELAH GAS COMPRESSOR STATIONGASCO/SIEMENSINSTALLATION OF 110 MM/750MM HDPE BY DIRECTIONAL BORINGTAWEELAH
36A 12829AADCINSTALLATION OF 8WAY 200MM HDPE/PVC BY THRUST/DIRECTIONAL BORINGALAIN
37CONSTRUCTON OF PHASE 1 INTERNAL ROADSAbudhabi Future Energy Company PJSCINSTALLATION OF 8WAYS 200MM HDPE PIPES BY DIRECTIONAL BORINGMASDAR CITY
38A14477AADCINSTALLATION OF 2/4/6/8 WAY 2X200MM AND 2X100MM HDPE PIPES BY DIRECTIONAL BORINGALAIN
39CONSTRUCTION OF ALL INFRASTRUCTURE & ANCILLARY WORKSADDCINSTALLATIN OF ONE WAY225/500/315MM HDPE PIPE AND 6WAY 200MM HDPE PIPE BY DIRECTIONAL BORINGAL MERIF
40CMW-11058-C002CMWINSTALLATION OF 4X4” /3X8”/1X2.5” DIA HDPE PIPES BY DIRECTIONAL BORINGAL DHAFRA
41CHANNEL CROSSING IN SADIYATH ISLANDCMWINSTALLATION OF 2WAY 110/125MM HDPE PIPE UNDER SEA CHANNEL BY DIRECTIONAL BORINGYAS ISLAND
42A 12840AADCINSTALLTION OF 2X110MM HDPE PIPES BY DIRECTIONAL BORING METHODALAIN
43CONSTRUCTION OF INTERNAL ROAD AND INFRASTRUCTURE OF 354MUSANADAINSTALLATION OF 160MM/225MM DIA UPVC PIPES BY THRUST BORINGSHAKHBOUT CITY
44CONSTRUCTION OF CYCLE TRACKMUSANADAINSTALLATION OF 4WAY 200MM HDPE PIPE BY DIRECTIONAL BORINGAL-HUDAYRIAT ISLAND
45CONTRACT NO. 16392.02ADCOINSTALLATION OF ONE WAY 4”/6” CS PIPE BY DIRECTIONAL BORINGBAB - HABSHAN, ASAB, BUHASA
46CONNECTION OF UMM LAFEENA –PHASE 1MUSANADAINSTALLATION OF 250 MM HDPE PIPE UNDER SEA CHANNEL BY DIRECTIONAL BORINGUMM LAFEENA ISLAND
47A 11414.1AADCINSTALLATION OF 4WAY 200MM HDPE PIPE BY DIRECTIONAL BORINGAL AIN
48Internal Roads- Al Ain Stage 23AAMINSTALLATION OF 315mm / 355 mm HDPE PIPE BY DIRECTIONAL BORINGAL AIN
49O-15076 SWS AAMINSTALLATION OF 600 mm HDPE PIPE BY DIRECTIONAL BORINGALAIN
50Buhasa Swag CO2 Injection ProjectADNOCINSTALLATION OF 6wayX110 mm HDPE PIPE BY DIRECTIONAL BORINGBuHASA
51Mid Island Parkway – 1ADMTHDD works for Installation of 110mm-630 mm HDPE PipesABU DHABI ISLAND
52N-17728TRANSCOHDD works for Installation of 200/110 mm HDPE Cable DuctsHUDAYRIAT
53Stage (24,25,26) Projects – Al AinAACMHDD works for Installation of 75mm to 630mm HDPE pipesAL AIN
54JUBAIL ISLAND- Collective ContractJUBAILHDD works for Installation of 6 ways x 110 mm HDPE pipesJUBAIL ISLAND
55ADNOC Lightning ProjectADNOCHDD works for Installation of 225/110 mm HDPE pipesMIRFA & SHWEIHAT
Salwan Projects List 02

Project Details 2013

We work on a wide range of building typologies and projects
S/NO.CONTRACT NO.CLIENTMAIN CONTRACTORWORK DESCRIPTIONLOCATION
1D - 101733ADDCLARSEN & TOUBROINSTALLATION OF 200MM HDPE BY HDD ABU AL ABYED ISLAND
2KPIZ-1001-257ADPCAL NASRINSTALLATION OF 200MM + 110MM HDPE BY HDDTAWEELA AREA
3RFP/PCD-FH/WR/SAMHA/13/11ENVIRONMENTAL AGENCYNAEL BIN HARMALINSTALLATION OF 450MM HDPE BY HDDAL SAMHA AREA
4KPIZ-1001-272ADPCLARSEN & TOUBROINSTALLATION OF 200MM + 110MM HDPE BY HDDTAWEELA AREA
5P-11500 (BTG)ADCO - NPCCCCICINSTALLATION OF 4"TO 20" STEEL BY HDDHABSHAN
609272COMMAND OF MILITARY WORKSCOMBINED GROUPINSTALLATION OF 600MM TO 1200MM STEEL BY HDDMAHAWI AREA
7D-7057A, VO2ADWEALARSEN & TOUBROINSTALLATION OF 200MM + 110MM HDPE BY HDDRUWAIS AREA
8P-11500 (BTG)ADCO - NPCCLARSEN & TOUBROINSTALLATION OF 200MM + 110MM HDPE BY HDDHABSHAN
9482MUBADALA (GASCO)ROYAL GASINSTALLATION OF 600MM STEEL BY HDDSOWWAH ISLAND
10KPIZ-1001-257ADPCEIGHTON (HLG)INSTALLATION OF 110MM HDPE BY HDDTAWEELA
11D-11915ADDCLINDENBERGINSTALLATION OF 200MM + 110MM HDPE BY HDDABUDHABI ISLAND
12KPIZADPCAL JABERINSTALLATION OF 1070MM HDPE BY THRUST BORINGTAWEELA
13AUH FUTURE SCHOOLDIWANSEIDCOINSTALLATION OF 200MM HDPE BY THRUST BORINGSHAMKHA
14DI PIPELINESDOTBRIGHT DEALINSTALLATION OF 110MM HDPE BY DIRECTIONAL BORINGSWEIHAN ROAD
15RA-100DOTTEMCOINSTALLATION OF 200MM HDPE BY DIRECTIONAL BORINGRAZEEN
16POWER SUPLY TO DEER FIELDADDCRAS AL WADIINSTALLATION OF 160MM PVC/HDPE BY THRUST/DIRECTIONAL BORINGAL BAHIYA
17N-6755ADWEAHELIOPOLISINSTALLATION OF 3X225+2X125MM HDPE BY TDIRECTIONAL BORINGNEW AIRPORT, ZAYED SPORTS CITY-ONGOING
18N-7015ADWEAHELIOPOLISINSTALLATION OF 3X250+2X125MM HDPE BY DIRECTIONAL BORINGAL AIN -ONGOING
19N-6526ADWEAHELIOPOLISINSTALLATION OF 3X225+2X125MM HDPE BY DIRECTIONAL BORINGYAS ISLAND
20CAST HOUSE- STOCK YARDEMALAL FUTTAIM CARILLIONINSTALLATION OF 110MM HDPE BY DIRECTIONAL BORINGABU DHABI
21KPIZADPCCCICINSTALLATION OF 110/160MM HDPE BY DIRECTIONAL BORINGTAWEELA
22QFDADCOCCEPINSTALLATION OF 14" GAS LINE BY DIRECTIONAL BORINGQUSAHWIRA
23N - 6755ADWEAHELIOPOLISINSTALLATION OF 3X225+2X125MM HDPE BY DIRECTIONAL BORINGAL FALAH
24D - 11617D O TRANYAINSTALLATION OF 200MM HDPE BY DIRECTIONAL BORINGAL KHATIM
250300407GASCOAL HASSAN ENGG.INSTALLATION OF 160MM HDPE BY DIRECTIONAL BORINGBUHASA
26C002 PACKAGE IIBUNYACOMBINED GROUPINSTALLATION OF 200/110MM HDPE BY DIRECTIONAL BORINGREEM ISLAND-ONGOING
27D - 101448ADDCACECOINSTALLATION OF 200MM HDPE BY DIRECTIONAL BORINGADNEC AREA
28KHAZNA DATA CENTERMUBADALAAL NASRINSTALLATION OF 200/110MM HDPE BY DIRECTIONAL BORINGAL RAHA ONGOING
29D9219ADDCACECOINSTALLATION OF 200/110MM HDPE BY DIRECTIONAL BORINGPRESIDENTIAL PALACE RAS AL AKHDAR AREA
30D8250 V02ADDCAL NASRINSTALLATION OF 450MM HDPE BY DIRECTIONAL BORINGPRESIDENTIAL PALACE RAS AL AKHDAR AREA
31N-12380TRANSCOTIME ELECTROINSTALLATION OF 280/125MM HDPE BY DIRECTIONAL BORINGMADINAT ZAYED – LIWA ONGOING
Salwan Projects List 03

Project Details 2012

We work on a wide range of building typologies and projects
S/NO.CONTRACT NO.CLIENTMAIN CONTRACTORWORK DESCRIPTIONLOCATION
1CONT. NO. CE/220F/2007DEWAETA STARINSTALLATION OF 4 WAY 160 + 110 MM HDPE BY HDDDUBAI
2TELEPHONE LINKSETISALATENGG. UNITINSTALLATION OF 300MM HDPE BY HDDSHAHAMA/ ALBAHIA/ GHANTOOT
3CONT. NO. CE/256/2007DEWAHELIOPOLISINSTALLATION OF 5 WAY 160 MM HDPE BY HDDJABEL ALI
4A-3839.1ADWEALARSEN & TOUBROINSTALLATION OF 5 WAY 200 MM HDPE BY HDDAL AIN AREA
5D-5979ADNOCCODE CONTRACTINGINSTALLATION OF 2(4X225+4X125)MM BY HDDRUWAIS AREA
6N – 6229/ 51675TRANSCOHELIOPOLISINSTALLATION OF 225+125 MM HDPE BY HDDTAWEELA
7A-4496AADCACECOINSTALLATION OF 200 MM HDPE BY HDDAL AIN AREA
8UPGRADING ALAIN CITY-2ALAIN MUNICIPALITYALNASRINTERNATIONAL INSTALLATION OF 150 MM PVC BY THRUST BORINGAL AIN AREA
9REEM ISLAND PACKAGE 5&6TOMOUHORASCOM CONTRACKINSTALLATION OF 900 MM STEEL BY THRUST BORINGAL REEM ISLAND
10GASCO-144553GASCOALSA ENGG.INSTALLATION OF 600MM HDPE BY HDDTAWEELA AREA
11TRUCK ROAD NDRC CROSSALAIN MUNICIPALITYBARRARI FOREST MANAGEMENTINSTALLATION OF 550/315MM HDPE BY HDDALAIN TRUCK ROAD AREA
12ZAKIR STATION- AL ROWDAAL AIN MUNICIPALITYSIENIT INTL ENGG.INSTALLATION OF 550/ 315 MM HDPE BY HDDAL AIN AREA
13A-4923 LOT-2AADCAL HUSAM GEN. CONTRACTINGINSTALLATION OF 160/ 200 MM HDPE BY HDDAL AIN AREA
14A-5877AADCDRIPCOINSTALLATION OF 160/ 200 MM HDPE BY HDDAL AIN AREA
15N-6312TRANSCOTIME ELECTROINSTALLATION OF 4X200+2X125 MM BY HDDRAS AL KHIMA
16A – 3900.1AADCLARSEN 7 TOUBROINSTALLATION OF 2 WAY 200 MM HDPE BY HDDAL AIN
17PO25- HAMIM RESORTADNOCCODE CONTRACTINGINSTALLATION OF 2 WAY 200 MM HDPE BY HDDHAMIM AREA
18D- 5987ADDCTASNEEMINSTALLATION OF 160/200 MM HDPE BY HDDWESTERN REGION
19D-4860ADDCCODE CONTRACTINGINSTALLATION OF 500 MM HDPE BY HDDAL HAMRA MILITARY CAMP
20D-7894ADDCCODE CONTRACTINGINSTALLATION OF 200 MM HDPE BY HDDMUSSAFAH / ABU DHABI
21SALAM ST. CONT.-2ADSSCAL BARRAKINSTALLATION OF 3X225+2X125 MM HDPE BY HDDABU DHABI
22A-3839.1ADWEALARSEN & TOUBROINSTALLATION OF 3X200MM HDPE BY HDDALAIN AREA
23D-9709/BADDCHELIOPOLIS ELECTRICINSTALLATION OF 200MM HDPE BY HDDWESTERN REGION, ABU DHABI
24D-9710ADDCHELIOPOLIS ELECTRICINSTALLATION OF 200MM HDPE BY HDDEASTERN REGION 25 ABU DHABI
25D-5979ADNOCCODE CONTRACTINGINSTALLATION OF 2(4X225+4X125)MM BY HDDRU26WAIS AREA27
26D-9709/AADDCACECOINSTALLATION OF 200MM HDPE BY HDDEASTER28N REGION 29 ABU DHABI
27CONT. 973MUNICIPALITY/ADSSCROYAL GARDENINSTALLATION OF 300 MM HDPE BY HDDABU DHABI, GOLF COURT
28AL REEM ISLANDBUNYAORASCOMINSTALLATION OF 300/600 MM HDPE BY HDD AL REEM ISLAND , AUH
29AL REEM ISLANDBUNYAMULTI LINKINSTALLATION OF 600 MM STEEL BY HDDAL REEM ISLAND ABU DHABI
30DS- 174DUBAI MUNICIPALITYGURIS & ACD J.VINSTALLATION OF 600/1070 MM STEEL BY HDDDUBAI
31HABSHANADNOCAL DANAINSTALLATION OF 110MM HDPE BY HDDHABSHAN
32CONT.444MUNICIPALITY/ADSSCGULF CONTRACTORSINSTALLATION OF 280 MM HDPE BY HDDAL NAHDA, ABU DHABI
33N - 4352TRANSCOHELIOPOLISINSTALLATION OF 225+125 MM HDPE BY HDDABU DHABI
34N-6229/51675TRANSCOHELIOPOLISINSTALLATION OF 225+125 MM HDPE BY HDDTAWEELA
35QASEEWRAHDORCH CONSULTARABIAN CONSTRUCTION CO.INSTALLATION OF 225+125 MM HDPE BY HDDUMM AL ZUMUL
36CAPITAL PLAZAPRIVATEARABIAN CONSTRUCTION CO.INSTALLATION OF 200 MM HDPE BY HDDABU DHABI
37D – 9811 GAYATHIADDCDELMA ENGG. INSTALLATION OF 500/450 MM HDPE BY HDDGAYATHI
38MERFA ZONE-3AADSSCGHANTOOT TRANSPORTINSTALLATION OF 500/450 MM HDPE BY HDDMERFA
39SALAM ST. CONT. -2ADDCGULF CONTRACTORSINSTALLATION OF 500 MM HDPE BY HDDABU DHABI
40CONT. NO. 143A, P47ADDCGHANTOOTINSTALLATION OF 160/ 500/450 MM HDPE BY HDDMERFA
41CONTRACT ND/11/10/39AADCBINSAADINSTALLATION OF 160MM HDPE BY HDDAL AIN
42A 4498AADCACECOINSTALLATION OF 160MM HDPE BY HDDAL AIN
43AL SHUWAIBPRIVATETRACKERS GEN. CONT.INSTALLATION OF 160 MM HDPE BY HDDDUBAI
44PGD-180ADDCGULF CONTRACTORSINSTALLATION OF 160 MM HDPE BY HDDABU DHABI
45N-6526TRANSCOHELIOPOLISINSTALLATION OF 3X225+2X125 MM BY HDDYAS ISLAND
4623 VILLAETISALATASWARINSTALLATION OF 300 / 400 / 600 MM BY THRUST BORINGDELMA ISLAND
47JUMEIRA PARKNAKHEELNUROLINSTALLATION OF 900 / 1070 MM STEEL BY THRUST BORINDUBAI
48INST- TAWEELAADDCBINSAADINSTALLATION OF 300/400 MM HDPE BY HDDTAWEELA
49D - 9857ADDCTIME ELECTROINSTALLATION OF 200 mm HDPE PIPES BY HDDMUSSAFAH ROAD
50AIRPORTAIRPORT AUTHORITYAL WARDINSTALLATION OF 110 MM HDPE BY HDDAIRPORT ABU DHABI
51E - 132ADWEAENGINEERING UNITINSTALLATION OF 300MM HDPE BY HDDAL WATHBA AREA
52ABP - 0184ADWEASEIDCOINSTALLATION OF 8X110MM HDPE BY HDDAL BATEEN PARK ABU DHABI
53P - 2040ADNECKHARAFI NATIONALINSTALLATION OF 125X200MM HDPE BY HDDADNEC PHASE - 4
54D - 9216ADDCTIME ELECTROINSTALLATION OF 160MM HDPE BY HDDE – 40 ABU DHABI
55D - 101103ADDCACECOINSTALLATION OF 200MM HDPE BY HDDMUSSAFAH
56AL REEMBUNYAORASCOM CONTRACK JVINSTALLATION OF 160MM HDPE BY HDDAL REEM ISLAND
57D - 10359ADDCRANYA CONT.INSTALLATION OF 200MM HDPE BY HDDABU DHABI
58D - 8602ADWEADELMA ENGG.INSTALLATION OF 450MM HDPE BY HDDASAB AREA
59AD21-T-F-01-10ICTCROWN EMIRATESINSTALLATION OF 1070MM STEEL BY THRUST BORINGNATION TOWERS ABU DHABI
Salwan Projects List 04

Project Details 2011

We work on a wide range of building typologies and projects
S/NO.CONTRACT NO.CLIENTMAIN CONTRACTORWORK DESCRIPTIONLOCATION
1D-2150ADDCHELIOPOLIS ELECTRICINSTALLATION OF 160/200MM PVC PIPESWESTERN REGION, ABU DHABI
2D-2157ADDCHELIOPOLIS ELECTRICINSTALLATION OF 160/200MM PVC PIPESWESTERN REGION, SILA, MAFRAQ. ABU DHABI
3D-4062ADDCHELIOPOLIS ELECTRICINSTALLATION OF 160/200MM PVC PIPESBANIYAS, AL KHATIM. ABU DHABI
4D-3484ADDCHELIOPOLIS ELECTRICINSTALLATION OF 160/200MM PVC PIPESSHAHAMA, AL BAHIA.
5A-1937ADDCHELIOPOLIS ELECTRICINSTALLATION OF 200MM PVC/HDPE PIPES FOR ELECTRIC CABLEAL AIN
6D-3998ADDCHELIOPOLIS ELECTRICINSTALLATION OF 200MM PVC/HDPE PIPES FOR ELECTRIC CABLEAL BAHIA/ABU DHABI
7A-2043AADCTIME ELECTROINSTALLATION OF 160/200MM PVC DUCT FOR ELECTRIC CABLEAL AIN
8A-1022AADCTIME ELECTROINSTALLATION OF 160/200MM PVC/HDPE DUCT FOR ELECTRIC CABLEAL AIN
9A-1815AADCTIME ELECTROINSTALLATION OF 160/200MM PVC/HDPE PIPES FOR ELECTRIC CABLEAL AIN
10D-3390AADCBIN SAAD CONTRACTINGINSTALLATION OF 160/200MM HDPE DUCT FOR ELECTRIC CABLETAWEELA
11INST-TAWEELAADDCBIN SAAD CONTRACTINGINSTALLATION OF 300/400 HDPE PIPES BY HDDTAWEELA
12A-1988AADCHELIOPOLIS ELECTRICINSTALLATION OF 200 MM PVC FOR ELEC. CABLEAL AIN
13A-1936AADCHELIOPOLIS ELECTRICINSTALLATION OF 200 MM PVC FOR ELEC. CABLEAL AIN
1423 VILLA PROJECTAADCASWARINSTALLATION OF 300/ 400/ 600 MM STEEL BY THRUST BORINGDELMA ISLAND
15MAHDAWATER & ELECTRICITYAL FALAJ AL KHALEEJ OMANINSTALLATION OF 300/ 400 MM HDPE BY HDDAL BURAIMI/ MAHDA
16MAHDA PHASE -2WATER & ELECTRICITYAL MATARINSTALLATION OF 300/ 400/ 600 MM STEEL BY THRUST BORINGAL BURAIMI/ MAHDA
17A-2312AADCHELIOPOLIS ELECTRICINSTALLATION OF 200 MM STEEL BY THRUST BORINGAL AIN
18ICAD-NDRCWATER & ELECTRICITYORIENTAL CONTRACTING CO.INSTALLATION OF 450MM HDPE BY HDDMUSSAFAH/ABU DHABI
19A-4790AADCHELIOPOLIS ELECTRICINSTALLATION OF 200 MM PVC PIPES BY THRUST BORINGALAIN
20CONT.NO.300-P21MUNICIPALITY/ADSSCGHANTOOT TRANSPORTINSTALLATION OF 600 MM STEEL BY THRUST BORINGAL WATHBA EAST
21ELYASAT ISLANDTABREEDARABIAN CONSTRUCTION CO.INSTALLATION OF 150 MM HDPE PIPES BY HDDELYASAT ISLAND
22G-4010-3ADWEAHELIOPOLIS ELECTRICINSTALLATION OF 200 MM PVC/HDPE PIPES BY THRUST/HDD/BORINGMUSSAFAH/ICAD
23D-5199ADDCHELIOPOLIS ELECTRICINSTALLATION OF 150 MM PVC/HDPE PIPES BY THRUST/HDD/BORINGABU DHABI
24JUMEIRA PARKNAKHEELNUROLINSTALLATION OF 900 /1070MM STEEL BY THRUST BORINGDUBAI
25CONT.C42445DASMAN / TAKREERTOLEDOINSTALLATION OF 18” GAS PIPES BY HDDICAD -MUSSAFAH
26N-3969/446TRANSCOLARSEN & TOUBROINSTALLATION OF 110 MM HDPE PIPES BY HDDALAIN/ SWEIHAN
27TELEPHONE LINKSETISALATAL HASAN AL MENHALYINSTALLATION OF 110 MM HDPE PIPES BY HDDBANIYAS/ ABU DHABI
28TELEPHONE LINKSETISALATEMCC/ AL HADEER GEN. CONT.INSTALLATION OF 300 MM HDPE PIPES BY HDDBEDAZAYED
29TELEPHONE LINKSETISALATEMCC/ AL HADEER GEN. CONT.INSTALLATION OF 300/110 MM HDPE PIPES BY HDDALAIN
30TELEPHONE LINKSETISALATAL HASAN AL MENHALYINSTALLATION OF 110 MM HDPE PIPES BY HDDAL WATHBA, ABU DHABI